Home
The Pinnacle
Six In The Stix
Pinnacle Challenge
Orienteering
MTB Tips
Trails
Local Loops
Gallery
Forum
Contacts
Links
Trail Work & Conditions - New Connector Trail
Team-Pinnacle.org Forum
Login
Forum
->
Trail Work & Conditions
->
New Connector Trail
Author
Message
rockboy
Posts: 2086
Location: Newport
Posted: Fri Oct. 24, 2008 9:13 am
I cut a new connector trail from Pine Link over to Summer St near Salem's Lot. It's raked and ready to ride. The Summer street end is slightly offset towards the Pinnacle from Salem's lot trail but it's easy to find.
Ryan
Forum
->
Trail Work & Conditions
->
New Connector Trail
Copyright 2024 Team-Pinnacle.org. All Rights Reserved.
About Team-Pinnacle.org
|
NH Cycling Safety
|
All Race Results
Hosting & Development by
Functional Art Solutions